Quebec Gentilly Nuclear Generating Station

Quebec Nuclear Power Station    (Resource  Quebec Nuclear Power Station )

Gentilly Nuclear Generating Station

From Wikipedia, the free encyclopedia

Gentilly Nuclear Generating Station

The Gentilly-2 (left) and Gentilly-1 (right)
nuclear generating stations
Gentilly Nuclear Generating Station is located in Quebec
Location of Gentilly Nuclear Generating Station
Official name Centrale nucléaire de Gentilly
Country Canada
Location Bécancour, Quebec
Coordinates 46°23′45″N 72°21′25″WCoordinates: 46°23′45″N 72°21′25″W
Status Operational
Construction began 1973
Commission date October 1, 1983
Owner(s) Hydro-Québec
Operator(s) Hydro-Québec

Reactor information
Reactors operational 635 MW
Reactors decom. 250 MW
Reactor supplier(s) Atomic Energy of Canada Limited

Power generation information
Capacity factor 76.4%
Annual generation 3,491 GWh
Net generation 120,310 GWh
Website
Hydro-Québec: Gentilly-2
As of 2012-03-24
Gentilly Nuclear Generating Station (or Centrale nucléaire de Gentilly in French) is a Canadian nuclear power station located near Bécancour, Quebec. The facility derives its name from the Gentilly suburb of the city of Bécancour, in which it is located. It is around 100 km north east of Montreal.
The Gentilly site contains the only power reactors in Quebec (there is also a SLOWPOKE reactor at the Ecole Polytechnique) and comprises two nuclear reactors (one CANDU-BWR prototype, now shut down, and one CANDU) located on the south shore of the St. Lawrence River. The facility was constructed in stages between 1966–1983 by the provincial Crown corporation, Hydro-Québec. Gentilly-1 is closed and in the decommissioning process, while Gentilly-2 is currently in operation.

Contents

Gentilly-1

Gentilly-1 was a prototype CANDU-BWR reactor, based on the SGHWR design. It was designed for a net output of 250MW(e). The reactor had several features unique amongst CANDU reactors, including vertically oriented pressure tubes (allowing for the use of a single fuelling machine below the core), and light-water coolant. These features were intended to reduce the cost and complexity of the unit, again to make it an attractive export unit. However, the design was not successful, and over nearly 7 years recorded only 180 on-power days. Gentilly-1 is no longer in operation.

Gentilly-2

Gentilly-2 is a standard CANDU 6 reactor, similar to the Point Lepreau Nuclear Generating Station. The CANDU 6 is a successful reactor type, and has been exported to South Korea, Argentina, Romania and China. The plant has a net output of 675MW(e). Unlike the adjacent Gentilly-1 reactor, Gentilly-2 has had a good service record since start-up in 1982, with a cumulative operating factor of 76.4%,[1] and is due to shut down for refurbishment sometime around 2012.
On August 19, 2008, Quebec announced that it will spend $1.9B to overhaul Gentilly-2 that should extend its lifespan to 2040.[2]
The Gentilly site also houses a 411MW gas turbine generation plant. The Bécancour generating station was commissioned in 1992-1993.[3]

(Resource Quebec Nuclear Power Station ) 

See also

References

  1. ^ International Atomic Energy Agency (March 23, 2012). "Gentilly-2". Power Reactor Information System. Retrieved 2012-03-24.
  2. ^ "Quebec to spend $1.9B on lone nuclear power plant". CBC.ca. 2008-08-19. Retrieved 2008-08-19.
  3. ^ Hydro-Québec. "Thermal generating stations". Retrieved 2012-03-24.